Vectro
All products
Vectro ApronLive

A flight record, not another video wall.

Edge turnaround intelligence with a per-flight Gantt, human-governed detection review, and core workflows that run inside your network.

How it connects

Live in production at a Canadian regional airport, and improving every month with the teams who use it.

Inside the product

See the flight record

Per-flight turnaround Gantt with evidence-linked event bands.
Per-flight turnaround Gantt with evidence-linked event bands.
Human-governed detection review: approve, reject, correct.
Human-governed detection review: approve, reject, correct.
Alert centre with ownership and resolution history.
Alert centre with ownership and resolution history.
Edge-first: core workflows run locally inside your network.
Edge-first: core workflows run locally inside your network.

Governed detection

01

Detect

The edge pipeline detects events on the apron from the camera feed.

02

Track

Each event is tracked across frames and associated with a flight.

03

Associate

Detections are matched to the right flight using AODB context.

04

Review

A person approves, rejects or corrects every detection before it counts.

05

Learn

Corrections feed back into the system so detection improves over time.

Standard sensor pack

Front, port and starboard lanes cover the stand, each tuned to its view. An optional jetbridge camera adds bridge docking and alignment.

Edge deployment

An edge appliance and switch with SSD evidence storage. Core workflows run inside the network boundary, and cloud is optional.

Security and privacy

Role-based access, MFA, and retained clips under your control. No passenger faces are the goal of the model: it detects equipment and aircraft states.

Commissioning and acceptance

Site survey, camera placement, AODB connection, replay testing, and acceptance sign-off before a stand goes live.

Apron resources

Technical Guide

Vectro Apron Product Detail & Setup Guide

Architecture, camera coverage, edge deployment, security, integrations, commissioning, and acceptance guidance.

Operations Guide

Vectro Apron Knowledge Base

Daily operation, detection review, administration, troubleshooting, and field support procedures.

Presentation

Vectro Apron Product Overview

Editable presentation for product demonstrations, technical briefings, and stakeholder discussions.

Video

Vectro Apron Product Reel

A concise visual introduction to the Vectro Apron operating loop.

FAQ

Questions we hear

See Vectro Apron running

A 30 minute walkthrough in a real airport context, specific to your operation. No slides.